The city will be conducting scheduled paving on selected roadways.
The schedules are as follows:
5/21/24 - 5/22/24
Ashland Drive (From Otter Creek Road to Kingsbury Drive)
Cliftee Drive
5/28/24 - 5/29/24
Tyne Blvd (Between Robert E Lee Drive and Beauregard Dr)
Please plan accordingly and use alternate routes to avoid any possible delays.